Warehouse Estate · Commercial Build · Enterprise Road, Pakenham
Two warehouses, back to back, with a tenant already moved in.
Electrical design and construct for two new warehouses, from the substation to tenant lighting, power and monitoring.

The brief
Two buildings, one estate, one tenant already in.
Offices, amenities, a comms room, EV charging and metering for every tenancy. Bekaert moved into the first warehouse while the second was still being built next door.
We delivered the complete electrical package for both buildings as design and construct, from the underground mains off the substation through to tenant lighting and power. Energy and water use had to be monitored across both buildings, so metering and monitoring were designed in from the start.
Scope of works
- Electrical design and construct for both warehouses
- Underground mains from the substation to each site main switchboard
- Site main switchboards, main distribution boards and tenancy distribution boards, with sub mains to each
- Warehouse, office and external lighting, including pole lights and power to the automatic gates
- General power to the warehouses, offices and amenities, plus smoke spill fan and pump house supplies
- Four EV chargers at each Warehouse 2 tenancy
- Energy and water monitoring: CT metering for each tenancy and the safety services, Wattwatchers energy monitoring and smart water meters
- NBN lead-in, testing and commissioning, and as-built drawings and manuals

The Full Circuit Method
Four stages, two buildings, back to back.
01 Understand the job completely
We worked both buildings through from the plans before pricing: two warehouses, three tenancies, EV charging at each, and energy and water monitoring that had to be designed in rather than added later.
02 Price it honestly
Priced as a full design and construct, so the electrical design, including the metering and monitoring, sat with the same team that installed it.
03 Own every part of it
Warehouse 1 ran from June 2024 to February 2025, Warehouse 2 from then to October 2025, around 6,500 labour hours across both. Extra metering, keypad and gate conduits, and power to the estate signage were absorbed within the program.
04 Stay connected
Bekaert now calls us directly. During the build they had us install their office data outlets, and since handover we've reworked power in their quality control room and handled their call-outs. We also commissioned the estate energy monitoring once the platform was ready.

Outcome
Both warehouses handed over on program, delivered back to back by the same team, with Bekaert operating next door for most of the second build. The first tenant has stayed with us for their ongoing electrical work.
Warehouse estate, Enterprise Road, Pakenham. 2024 to 2025.


