Skip to content
Positive Electrics electrician watching a sand wash plant at a quarry

Industrial Automation

Plant upgrades that hold to the shutdown window.

Control systems, motor control centres and the electrical infrastructure that keeps a plant running at capacity.

What plant managers deal with.

Your plant doesn't stop for electrical work. What you need is a contractor who plans around the window you've got, and who's still there when something trips at two in the morning six months later.

We've taken plants from first cut to first batch, and we've stayed on afterwards to keep them running. Grantville, Yarra Valley Quarries, Dandenong.

Talk to us about your plantElectrician working in a control cabinet of drives and terminals

What we do

From first cut to first batch.

Some of this is a new plant from scratch. Most of it is upgrading one that's been running for years. The work is the same either way.

The plants we work on

Batching, crushing, washing and processing. The detail changes between them, the constraints don't.

Talk to us about your plant

Concrete Batching

Batching plants where the wiring has to match the way the plant actually doses, weighs and mixes.

  • New switchboards and DB installation
  • Weigh hopper and bin vibrator wiring
  • Reticulation to water pumps and admix
  • Network and database commissioning for the batching system
Positive Electrics electrician walking between concrete walls on site

Quarries and Wash Plants

Crushing and washing plant, usually on a site that can't afford to sit idle while the work happens.

  • Main switchboards, MCCs and slurry drive cabinets
  • VSD motor control across the plant
  • Control room fit-off
  • Cable tray and reticulation across the site

Food and Beverage Processing

Production lines where the electrical runs from the switchboard through to the machine that fills the product.

  • Switchboards and process distribution
  • Machine and line connections
  • Works staged around production
  • Ongoing support once the line is running

Materials Handling and Processing

Steel, precast and other heavy processing sites, where the work has to happen around what's being made.

  • Plant and machinery connections
  • Three phase power and motor control
  • RCD and RCBO protected circuits
  • Scheduled testing across the site

Our process

The Full Circuit Method

Four stages on every plant we work on, same as every other job we take on. Understand it, price it, own it, then stay with it.

Plant work has a window and a process to respect. Running the same four stages is how we get both right before anyone's on site.

On a plant, that means:

  • Walking the plant and understanding the process before we price it.
  • A scope that fits the window you've got, with what's in and out stated plainly.
  • Switchboards, controls, commissioning and coordination, all ours to hold.
  • Ongoing controls support and maintenance once the plant is running.
See how we work

Case Studies

  • Industrial Automation
  • Grantville

A wash plant built around production.

Motor control, drives and PLC automation, with every shutdown planned so the quarry kept supplying.

  • Commissioned on water before sand
  • Quarry supplied throughout the build
View case study
Dandy Premix sand wash plant, with conveyors and sand stockpiles
  • Industrial Automation
  • Commercial Build

Show control for two roller coasters.

When the park added two roller coasters, we designed and installed the show control switchboards.

  • Both coasters open for the summer peak
  • Ten years as the park's electrician
View case study
Aerial view of Gumbuya World, with green water slides, pools and the park grounds

Testimonial

“We've worked with Positive Electrics on several significant projects as well as day-to-day maintenance across multiple sites. Their team takes ownership of the work, communicates well, and consistently delivers quality results.”
Brendan Hall, Operations Manager (Dandy Premix)

New system, or one that isn't doing its job?

Get in touch