Gumbuya World · Commercial Build · Tynong North

The whole park rebuilt, and open on time.

Full electrical design and construct for a theme park redevelopment, and ten years of expansions since.

Aerial view of Gumbuya World, with green water slides, pools and the park grounds

The brief

Turning a family park into a theme park.

New rides, a water park, cafes, an entry building and animal enclosures. The gates were shut for all of it, and the reopening date was already set.

We were engaged directly by the park, designed the electrical package in-house, then built it. It had to be live and certified by opening day, and big enough to carry what the park added next.

Scope of works

  • Full electrical design and construct, designed in-house
  • New supply from the pole, with switching and protection for the transformer
  • A 630A CT-metered main switchboard, sized for future attractions
  • Underground mains from the substation, and kilometres of site conduit
  • A standby generator on an automatic transfer switch
  • Switchboards and submains to the entry building, cafes, locker rooms, rides and animal enclosures
  • Water park electrical: equipotential bonding, heat pumps, pump house, wave pool and Flow Rider supplies
  • Car park and park lighting on sensors and time clocks
  • Fit-off of the entry building, ticketing, turnstiles, cafe kitchen and ride connections
Padmount transformer beside the water park slides

The Full Circuit Method

Four stages, and a park we're still working on.

01 Understand the job completely

We walked the whole park and documented the existing infrastructure before any design was drawn. Where it was sound and suited the new layout, we built it in rather than replacing it.

02 Price it honestly

Engaged directly for the full package as a design and construct. Keeping the design in-house put one team behind the price, from first drawing to final certificate.

03 Own every part of it

Close to 6,000 labour hours over eight months. The cafe was cut over in a planned shutdown, the generator changeover ran after hours, and late changes were absorbed without moving the date.

04 Stay connected

A wave pool chamber in 2019, two roller coasters in 2022 with show control switchboards for both, and a switchboard rebuild in 2026. More than 150 jobs on one site over ten years.

Water park pump house pipework and valves

Outcome

The park reopened on time in December 2017. Ten years on, we're still the park's electrical contractor, through three major expansions and everything in between.

Gumbuya World, Tynong North. 2017 to today.