Industrial Estate · Commercial Build · Somerville

The builder changed. The electrician didn't.

Full site infrastructure and unit fit-out for an industrial estate of more than 100 warehouses, across three stages.

Warehouse under construction, with the high bay lights on and wall panels stacked on the slab

The brief

Two stages running at once, on one access road.

More than 100 warehouse units, each with its own office, metering and NBN connection. Stages 1 and 2 ran at the same time.

We delivered the full site infrastructure and the fit-out to every unit, from the supply pillar and main switchboards through to light and power in each warehouse. Both stages had to stay on program without one holding up the other, and whatever went in the ground had to carry the stages still to come.

Scope of works

  • Supply connection pillar and underground mains from the substation to the site main switchboard
  • Main and distribution switchboards, with individual metering for each tenancy
  • Underground sub mains from the main boards to every warehouse
  • General light and power to each warehouse and its office
  • NBN lead-in pit and conduit to every unit
  • Driveway lighting and power to the automatic gates
  • A full play centre tenancy fit-out in Stage 3, from switchboards to lighting, power and data
Warehouse roof steel and wall cladding, with a scissor lift on the slab

The Full Circuit Method

From the first trench to the last tenancy.

01 Understand the job completely

We worked the estate through from the builder's plans before pricing: more than 100 units, each with its own office, metering and NBN connection, built in stages on a site where Stage 2 could only be reached through Stage 1.

02 Price it honestly

Every tenancy was priced metered and connected from day one, rather than left to be retrofitted once tenants moved in.

03 Own every part of it

Two stages ran at once on one site. We sequenced our trenching around the other trades and tracked both programs against each other, so finishing one stage never slowed the start of the next.

04 Stay connected

When a new builder took over Stage 3 they brought us across, because we knew every cable, conduit and pit already in the ground. A play centre tenancy was added mid-job and we took on its full fit-out. Tenants now come to us directly, most recently Factory 88 in July 2026.

Electricians installing a switchboard in a new warehouse unit

Outcome

More than 100 units powered and connected across three stages, every stage finished on program, with one electrical contractor from the first trench to the last tenancy.

Industrial estate, Somerville. Three stages, two builders.